Mortar Break® is designed to prevent mortar droppings from blocking and clogging base wall and head joint drainage channels for 1” (25mm) cavity wall applications.
$
Additional Information
Installation Video / Instructions
A. Install mortar deflection devices as part of masonry wall construction and in accordance with manufacturer’s installation instructions.
B. Install in cavities at [all through wall masonry flashings with weep holes.] [locations detailed on Drawings.]
C. Place deflection strips horizontally and diagonally directly on flashings.